Environmental Stabilization/Reclamation
Twin Rivers Developments has experience working in British Columbia’s most critical and pristine water sheds and major rivers. We have completed in-stream, riparian, and floodplain works in the Fraser, Nechako, Peace, Bulkley & Skeena water sheds. This work demands a strict and comprehensive execution plan, including working closely with environmental monitors and engineers to ensure full compliance with all regulations and commitments.
Retaining Wall
- Concrete lock block walls
- GRS retaining walls
Rip Rap Armoring
- Supply, Haul & Place rip rap product up to 1.5 meters in size
- Supply & Place geotextile fabric
Water Control
- Culvert replacement in fish bearing watersheds
- Ditching to control water movements
- Stream Diversion
Habitat Construction
- Wetlands
- Streambed re-alignment
Construction Equipment
- Excavators (160 – 350 size)
- Dozers (D5 – D8 size)
- Rock Trucks (30 – 35 Tonne)
- Loaders Various Sizes
- Bomag 211D Packer
- Crew Truck / Tidy Tanks
- Mobile Service Trucks
Twin Rivers
Developments LTD.
5048 Banzer Drive
Prince George, BC
V2K 4H2
Office: 250-962-6657
Fax: 250-962-9600
Shop: 250-962-8133
Email: info@twinriversdev.com